KNIT COMPOSITE + DENIM · GAZIPUR, BANGLADESH · EST. 2004

Knit and denim, made to your spec in Bangladesh.

We knit, dye, print, sew and wash under one roof, so your tech pack goes through one team and one quality system. T-shirts to 5-pocket jeans, for brands in 22 countries.

UPDATEDuty-free access to the EU, UK and Canada continues until at least November 2029. What the UN deferral means for your sourcing

TECH PACK · SHEET 01/04

Style
NB-KT-160
Fabric
Single jersey, 140–200 g/m²
Composition
100% combed cotton
MOQ
1,200 per style
Technical flat of a crew-neck T-shirt, front viewABCE
Points of measure, cm. NB-KT-160 base size M.
Point of measureSMLXLTol.
AChest width, 1 cm below armhole49525558±1
BBody length from HPS69717375±1
CSleeve length from shoulder20212223±0.5
ENeck width, seam to seam1717.51818.5±0.5

Indicative FOB Chattogram $1.95–$3.90Full spec

  • 1,800,000knit garments a month
  • 420,000denim garments a month
  • 96sewing lines
  • 38tonnes knitted a day
  • 22countries shipped to

01 · PRODUCTS

Six product lines, one quality system

Every line has its own sewing team, minimums and lead time. These are our real numbers, so you can tell in a minute whether we fit.

01 / NB-KT-160

T-shirts & tops

MOQ
1,200 per style
Bulk
45–55 days
FOB from
$1.95

02 / NB-KP-220

Polos

MOQ
1,000 per style
Bulk
50–60 days
FOB from
$3.60

04 / NB-KA-240

Activewear

MOQ
1,000 per style
Bulk
50–60 days
FOB from
$2.40

05 / NB-DN-12

Denim

MOQ
1,500 per style
Bulk
60–75 days
FOB from
$7.20
Operators at their sewing machines on the Northbay sewing floor, with finished garments stacked beside them
FIG. 02 · Sewing floor 2, lines 41–56 · Konabari, Gazipur

02 · YOUR SOURCING CHECKLIST

The six questions every buyer asks first

Answered here, so the first call can be about your product.

  1. Q1 · MINIMUMS

    What's your MOQ, really?

    1,200 pieces per style and 600 per colour for knits; 1,500 per wash for denim. On our stock fabrics, 300 per colour.

    MOQ by product
  2. Q2 · LEAD TIME

    When does the clock start?

    Bulk is 45–60 days for knit and 60–75 days for denim, counted from PP-sample approval. We'll show you every step on a T&A calendar.

    Plan your dates
  3. Q3 · COMPLIANCE

    Can we see the audits?

    amfori BSCI A, WRAP Gold, SMETA 4-pillar, an RSC-covered building and LEED Platinum. Reports come in our compliance pack, under NDA.

    Certifications
  4. Q4 · TRACEABILITY

    Where does the cotton come from?

    Every yarn lot is recorded to its spinner and country of origin. For US orders we isotope-test the yarn, so it stands up to a UFLPA review.

    Traceability
  5. Q5 · PRICE

    Roughly what will it cost?

    Indicative FOB Chattogram from $1.95 for a basic tee to $10.80 for a washed 5-pocket jean, at 5,000+ pieces. A costed quote follows your tech pack.

    Get a costed quote
  6. Q6 · COMMUNICATION

    Who will we talk to?

    One named merchandiser per account, working until 19:00 Dhaka (15:00 in Germany). Replies within 48 hours, Saturday to Thursday.

    How we work

03 · OPEN CAPACITY

Booking for spring 2027

December is full. The first open knit capacity is in January 2027, and denim has room from February. Book a slot with an approved PP sample and a 30% advance or LC.

Plan a timeline
Production capacity booked, by ex-factory month (updated 4 November 2026)
Ex-factoryKnitDenim
Dec 2026
Full
Full
Jan 2027
4% open
8% open
Feb 2027
16% open
21% open
Mar 2027
32% open
39% open
Apr 2027
51% open
56% open
May 2027
69% open
72% open

04 · CERTIFICATIONS

Audited, certified, and happy to show you

Request the compliance pack
  • amfori BSCISocial auditA rating · March 2026
  • WRAPSocial complianceGold · valid to Aug 2027
  • Sedex SMETA4-pillar auditJune 2026 · no non-compliances
  • OEKO-TEX STANDARD 100Product safetyClass I (baby) to IV
  • GOTSOrganic textilesScope certificate · 2026
  • OCS & GRSOrganic and recycled contentScope certificates · 2026
  • ISO 14001Environmental managementCertified since 2018
  • Higg FEMFacility environmentVerified 2025 · 78/100
  • ZDHCWastewaterProgressive level
  • RSCBuilding, fire, electrical safetyRemediation 100% complete
  • LEED PlatinumGreen building (USGBC)Certified 2021
  • Better CottonCotton sourcingMember since 2017
A cotton harvester working a field

05 · TRACEABILITY

Know which field your T-shirt started in

For every order we keep the chain from bale to carton: spinner, yarn lot, knitting and dye lot, cutting ticket, line and carton. US-bound yarn is isotope-tested by an independent laboratory before knitting starts.

  • Cotton origins: USA, Brazil, Australia, West Africa and India
  • No yarn or fabric from the Xinjiang region, ever
  • Ready for the EU Forced Labour Regulation (from 14 December 2027)
How traceability works

06 · CASE STUDIES

What buyers moved to us, and why

All case studies
  • CASE 01 · SCANDINAVIA · OUTDOOR

    Organic tees and fleece, 140,000 pieces a year

    Moved from a two-supplier set-up to one GOTS-certified composite. Shade claims fell from 3.1% to 0.4% in the first season.

  • CASE 02 · UK · HIGH STREET

    Denim re-sourced for lower water use

    Switched four core washes to laser and ozone. 58% less water per pair, signed off on the first PP sample.

  • CASE 03 · USA · DIRECT-TO-CONSUMER

    Heavyweight basics with cotton you can prove

    320 g/m² hoodies and 200 g/m² tees with isotope-tested US and Australian cotton. Cleared CBP on every shipment.

07 · INSIGHTS

Notes for sourcing teams

All insights

NEXT STEP

Send a tech pack. Get a costed reply within 48 hours.

A merchandiser reviews every request, checks it against our open capacity and replies with an indicative FOB, MOQ and timeline. NDA on request, before you share a single sketch.

Request a quote WhatsApp a merchandiser

Visiting Bangladesh? We'll collect you from Hazrat Shahjalal International Airport. The factory is about 90 minutes away.